ZT51JEH















| Work Height | 50.6m&& |
|---|---|
| Platform Height | 48.6m&& |
| Horizontal Outreach | 25m&& |
| A – Stowed Length (w/ platform) | 14.2m&& |
| D – Stowed Length (w/o platform) | 2.44m&& |
| B – Stowed Width | 2.5m&& |
| C – Stowed Height | 3.06m&& |
| E – Platform Length | 0.91m&& |
| F – Platform Width | 5.36m/4.69m&& |
| G – Platform Height | 0.4m&& |
| Platform Capacity | 300/454kg&& |
| Drive Speed | 4.5km/h&& |
| Gradeability | 45%(24°)&& |
| Platform Rotation | ±90°&& |
| H-Tail Swing | 1.95m&& |
| Max Wind Speed | 12.5m/s&& |
| Battery | 80V/606Ah&& |
| Charger | 80V/80A&& |
| Drive Motor | 6.5KW&& |
| Lift Motor | 30KW&& |
| Auxiliary Power | 12V DC&& |
| Hydraulic Tank Capacity | 300L&& |
| Crawler type | Foam filled tire&& |
| Gross weight | 26000kg&& |